Results 1 to 2 of 2

Thread: TWR Pre-CPT 02Aug11

  1. #1
    vACC-Controller
    Join Date
    16.03.2009
    Location
    Buchs, ZH
    Posts
    62
    Thanks Thanks Given 
    27
    Thanks Thanks Received 
    45
    Thanked in
    26 Posts

    Default TWR Pre-CPT 02Aug11



    Pse support me in my Pre-CPT at Zurich on 02Aug11.
    Last edited by Mike Welten (971511); 29.07.2011 at 21:50.

  2. Danksagungen

    Andreas Guecklhorn (02.08.2011)

  3. #2
    vACC-Controller
    Join Date
    16.03.2009
    Location
    Buchs, ZH
    Posts
    62
    Thanks Thanks Given 
    27
    Thanks Thanks Received 
    45
    Thanked in
    26 Posts

    Default

    Many thanks to all the pilots who flew last night and made an interesting and enjoyable evening.
    Thanks also to HP for taking the check and Nicolas for taking APP.
    Next step CPT
    Andy

  4. Danksagungen

    HP Rutschmann (03.08.2011)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •