    Default Basels main runway refurbishment in 2026

    EuroAirport’s main runway will be refurbished and temporarily closed from April 15 to May 20, 2026. During this time, flight operations will be handled via the secondary runway.
    Good pilot skills will definitely be needed during this time.

    Read the official statement from the airport here:
    https://www.euroairport.com/en/publi...-now-available

    A more detailed breakdown of the construction work is available here:
    https://www.euroairport.com/en/refur...-s-main-runway
    Jonas Kuster vACC Switzerland | www.vacc.ch

  2. Danksagungen

    Hermann Lehmann (Today), Nico Gysin (Today), Therese Elmiger (Today)

  3. #2
    vACC-Controller
    vACC-Pilot
    Hermann Lehmann (842743)'s Avatar
    Join Date
    10.01.2013
    Location
    4566 Oekingen
    Posts
    881
    Thanks Thanks Given 
    1.336
    Thanks Thanks Received 
    1.210
    Thanked in
    656 Posts

    Default

    Ich denke, das betrifft die virtuelle Fliegerei nicht....................oder?
    Mit freundlichen Grüssen

    Hermann Lehmann

Similar Threads

  1. Europa Tour - Frankfurt Main Tag 2 [24x1000]
    By Marc Laederach (843026) in forum Screenshots
    Replies: 0
    Last Post: 02.05.2009, 15:08
  2. Europa Tour - Frankfurt-Main Tag 1 [56x1000]
    By Marc Laederach (843026) in forum Screenshots
    Replies: 1
    Last Post: 27.04.2009, 17:48

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •