Results 1 to 1 of 1

Thread: Scheduled Downtime for all VATSIM Services - 28 September 2021

  1. #1
    vACC-Staff
    vACC-Examiner
    vACC-Mentor
    vACC-Controller
    vACC-Pilot
    Jonas Kuster (1158939)'s Avatar
    Join Date
    22.06.2010
    Location
    Dübendorf
    Posts
    3.771
    Thanks Thanks Given 
    2.626
    Thanks Thanks Received 
    7.700
    Thanked in
    2.593 Posts

    Default Scheduled Downtime for all VATSIM Services - 28 September 2021



    VATSIM will be undergoing a full network update, which requires us to bring all servers and some websites down for a period of around 2 hours. This will allow us to support network advancements in the immediate future and going forward.
    The downtime will begin on 28 September 2021 at 2300 UTC with estimated completion 29 September 2021 at 0100 UTC.
    Please note that this downtime is not to deploy the VATSIM Velocity update which is still in closed beta.

    Source: https://forums.vatsim.net/topic/3203...eptember-2021/
    Jonas Kuster Leader Operation vACC Switzerland | www.vacc.ch

  2. Danksagungen


Similar Threads

  1. VFR [Freitag, 28. September 2012] Alpine Group Flight - Tour de Suisse 2012 - Etappe 7
    By Pascal Hasler (1102170) in forum vACC Schweiz Events
    Replies: 1
    Last Post: 01.10.2012, 19:51
  2. Scheduled Downtime USA-C
    By HP Rutschmann (853347) in forum Non-Aviation Smalltalk
    Replies: 0
    Last Post: 28.10.2009, 18:13

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •